Atrevida Beer Co.

Organization:
Atrevida, an Independent Craft Brewery in Colorado
Production:
Before engaging with B. Ellen Consulting, this independent craft brewery used a 1-barrel pilot system. With Barb’s engineering know-how and experience, they scaled to a 10-Barrel brewhouse. Equipment was purchased before B. Ellen Consulting was brought in, and this project is currently in progress.
Problem:
With equipment already procured, Atrevida required experienced support to manage the complexities of installing and integrating multiple systems within an existing facility. Key challenges included:
- Integrating new equipment into an existing building and utility infrastructure
- Coordinating installation activities across multiple vendors and trades
- Verifying utility capacity for increased production demands
- Avoiding installation errors that could impact safety, performance, or future expansion
- Maintaining quality standards during the transition to larger-scale production
Approach:
B. Ellen Consulting is providing hands-on support throughout the installation phase, acting as an owner’s representative and technical resource. Current scope of work include:
- Installation Oversight & Coordination
- Review of brewhouse layout and equipment place
- On-site coordination with installers, contractors, and vendors
- Verification that installations align with manufacturer requirements and best practices
- Equipment Integration
- Installation support for the 10 BBL brewhouse system
- Integration of a roller mill into the grain handling workflow
- Installation of a keg washer to support expanded draft operations
- Custom pipe fittings & frames designed, built, and installed
- Utilities & Infrastructure Review
- Evaluation of existing electrical, water, and glycol systems
- Identification of gaps or constraints impacting equipment performance
- Coordination of corrective actions as needed
- Commissioning & Startup Support
- Pre-startup inspections and readiness reviews
- Support during initial system commissioning
- Troubleshooting and process optimization during early production runs
Solution:
By engaging B. Ellen Consulting after equipment procurement, Atrevida gained experienced oversight during a critical phase of the project. The ongoing support helps ensure that the new brewhouse is installed correctly, commissioned efficiently, and positioned for long-term operational success.
Expected Outcomes:
Upon completion, the brewery is expected to realize:
- More than 3× increase in monthly barrel production
- Improved system reliability through proper installation and integration
- Reduced operational risk during startup
- A production brewhouse positioned for future growth
Progress to Date:
- Brewhouse installation underway
- Glycol chiller and distribution piping installed
- Roller mill and keg washer installation in progress
- Utility tie-ins coordinated and verified
Contact B. Ellen Consulting
If you’re ready to create with quality, engineering, and passion in mind, we’re here to help